33 Old Broad Street
Client type Financial

Completed by
Highly complex refurbishment project spanning an entire building in central London.
This two year refurbishment provided 1,700 workstations across ten floors, collaboration areas, new meeting rooms, event spaces and an auditorium, a client meeting suite, a wellbeing suite and fitness space, a work café and rooftop terrace.
This project has had many challenges along the way in what was a very complex Cat A and Cat B refurbishment in the centre of London. We maintained the sustainability agenda with the introduction of air source heat pumps as part of our degasification strategy, installed a grey water harvesting system and LED lighting throughout, and in support of the circular economy have promoted the strategic re-use of furniture assets from elsewhere in the estate throughout the building.
ESP provided client-side design up to Stage 3 using REVIT, a powerful building information modelling (BIM) software, and then client-side governance to completion.