TACE - Deyes High School - Projects 01
Education

Deyes High School

Maghull
Mechanical & Electrical Design

Client type Main Contractor & Public Sector

KIER logo
Department for Education Logo

Completed by

Tace Black

A net-zero-carbon-in-operation secondary school with renewable heating technology.

The development included the demolition of the existing school buildings, excluding the sixth form, and the erection of a new two- and three-storey building. The buildings include associated indoor and outdoor sports facilities, a part-covered six-court multi-use games area (MUGA), external canopies, an energy centre and service compound, covered cycle parking, and motorcycle and car parking.

Sustainability was a key driver on the project, with the final design incorporating a biosolar green roof, solar panels, top-notch thermal insulation and passive ventilation solutions. Three air source heat pumps were installed, meaning there is no dependency on fossil fuels for heating or hot water. In addition, the team improved the thermal performance of the building with a significant betterment in external wall, floor and roof U-value performance to help drive down energy in use.

TACE - Deyes High School - Projects 02
TACE - Deyes High School - Projects 03